Hydro power plant Djerdap 3 is planned for construction | Upgrading of the existing three hydro power plants on the river Drim |
Installed power 2,400 MW | Installed power 500 MW |
Installed flow is 400 m³/s | Installed flow is 200 m³/s |
Serves for quarterly equalization of electricity in Serbia | Serves for annual equalization of electricity in Albania |
Uses the Danube River for water abstraction, additionally builds 2 artificial lakes that do not have running water from the river | Uses Skadar Lake for water abstraction, uses already built 3 artificial lakes that have running water from the river |
The total capacity of the reservoir is 578,000,000 m³ of water | The capacity of part of one reservoir is 1,100,000,000 m³ of water |
Ratio of accumulated water for installed 1 MW = 241,000 m³ of water | Ratio of accumulated water for installed 1 MW = 2,200,000 m³ of water and more |
The cost of construction is 6,000,000,000 euros | The cost of construction is 500,000,000 euros |
Construction time 6 to 10 years in stages | Construction time 2 years |
The time limit for the placement of capital is three times longer than the innovative method of construction | The time limit for the placement of capital is three times shorter compared to the classic method of construction |